Sand Dredger Vessel China

Sand Dredger Vessel China and the reasonable excavation width shall be selected to make the excavation width meet the design requirements. The excavated river channel sideline (water surface line) shall be basically straight, and the super width shall be within the allowable range. The over width shall not endanger the safety of embankment, existing slope protection and shore buildings.

Send Inquiry

Product Description

1.Mainly Specification Of Sand Dredger Vessel China

NO. Item

Water flow (m3)

Capacity(m3)

Dredging depth(m)

Discharge distance (m)

Pump type 

Mainly engine power(kw)

8 inch 

800 

160

8

800

WN200

220

10 inch 

1000

200

9

1000

WN250

336

12 inch 

1500

300

11

1200

WN350

559

14 inch 

2000

400

12

1500

WN300

634

16 inch 

2500

500

13

1500

WN350

746

18 inch 

3500

700

15

1500

WN450

895

20 inch 

4000

800

15

2000

WN500

1268

22 inch 

4500-5000

900-1000

16

2000

WN500

1491

24 inch 

5500

1100

20

2000

WN500

2190

28 inch

8000

1600

20

2500

WN700

3000

Sand Dredger Vessel China


2.Basic operating requirements for Sand Dredger Vessel China

1. During construction, the equipment position shall be calibrated frequently, the transverse movement characteristics of Sand Dredger Vessel China shall be mastered, and the reasonable excavation width shall be selected to make the excavation width meet the design requirements. The excavated river channel sideline (water surface line) shall be basically straight, and the super width shall be within the allowable range. The over width shall not endanger the safety of embankment, existing slope protection and shore buildings.

2. The water level gauge shall be set according to the standard accuracy, the indicator shall be calibrated and the lowering depth of cutter and mud bucket shall be adjusted frequently to make the excavated river bottom elevation meet the design. Under excavation and over depth shall be within the allowable range. At the same time, the super depth within 1 / 4 of the bottom width (no more than 10m) of the foot line on both sides of the river bottom shall be strictly controlled, and the stability of the bank slope shall not be affected.

3. The river slope should be excavated step by step, and the principle of overbalance at the bottom, overbalance at the top and overbalance at the bottom should be mastered, so that the area ratio of overbalance to underbalance is controlled between 1 ~ 1.5.

4. When the slope above the water surface is required to be trimmed, it should be trimmed manually or mechanically after underwater excavation, so as to maintain the flatness of the slope and meet the design requirements. The estuary line shall be neat and straight, and the water surface line shall be basically straight.

5. For the dredging of tidal reach with serious back siltation and river channel crossing wide lake area, special standards can be formulated according to the design requirements and the performance of Sand Dredger Vessel China.

Sand Dredger Vessel China





Hot Tags: Sand Dredger Vessel China

Send Inquiry

Please feel free to fill your inquiry in the form below. We will reply you in 24 hours.
We use cookies to offer you a better browsing experience, analyze site traffic and personalize content. By using this site, you agree to our use of cookies. Privacy Policy